Saturday, July 17, 2010

FRONT DOOR TRIMWORK

Today Tommy finished the moldings on the window and sliding door in the kitchen. I then caulked, puttied and painted the rest of the crown in the kitchen and the window/sliding door. Did two coats of paint on the crown molding for the master bedroom. Tommy put the extension jambs on the circular window above the front door, curved the plastic molding and built the trim above the door. Then I painted the arched windows in the dining and office.

Almost all the trimwork is finished on the first floor!

No comments:

Post a Comment