Tonight after work we started to prep the master shower for KERDI (it is a waterproofing membrane that we are going to put in the shower). First we cut a hole in the sheetrock to find the wire that will be used to hook up the Digital Shower Controller. Then we searched for the nipple in the wall that will attach to the handheld shower... we eventually found it, we had covered it up with the luan plywood to stiffen up the curved wall and didn't cut the hole out so the sheetrock guys didn't cut it out either...oops. Then Tommy fixed the cutout for the rainshower on the ceiling...the directions have you frame out a 9"x14" hole in the ceiliing joists so that is what the sheetrock guys cut out but really it should be a 9"x9" hole for the sheetrock itself... oh well...it is fixed now. Then we put the chair rail tile on the top of the tub skirt...looks really nice...
Tom's dad is picking up the tile tomorrow from the TileShop so we will soon be busy with that.
That's not Super Hooper
ReplyDelete