Saturday, January 29, 2011

CROWN MOLDING IN THE FOYER

Tom worked on the arched column area in the sitting room.  He created the ledge tops and made a molding to seperate the blue color of the sitting room with the beige color in the master.  I just have to paint them and then he can install them. Then he started the crown molding in the foyer today... It is a bit difficult because it is high.  He was able to install all the crown in the main section of the foyer, including the basecap. He just has to finish up the two long pieces along the staircase section...

While he did the crown I worked on sanding and priming all the spackle spots that I made fixing up some boo-boos in every room.

No comments:

Post a Comment