Today we drove back from the shorehouse and took a nap...even Hooper couldn't keep his eyes open... We did get up though and did some work on the tile in the master bathroom. Tommy worked on the Kerdi some more, he put all the kerdi on the bench in the shower. Meanwhile I put 3" long strips of the "crown" tile along the outside curved wall and then finished up a majority of that subway style tile.
Today I was home from work by myself. I worked on the tub area. First I cut up the mats of the tumbled rock and glued them individually to the front portion of the tub deck... that took quite some time and the mat is some sort of fiberglass so it gets itchy! Then I started using the leftover tile chunks (approximately 1.5" x 3") and tiled the front of the tub.
When Tommy got home I started to work on a short wall right when you walk in the door to the bathroom. Tommy worked on the kerdi. He worked on the top ledge of the curved wall which was quite a bit of work but it turned out great and definitely helped smooth it out and define the curve.
Today Tommy worked some more on the kerdi for the shower... and I finished up the walls in the toilet room and did a small wall in the main room... Tommy helped me with some of the cuts to speed things along...
We had a few visitors today... A. Brenda and the boys came to pick up Duke, so sad :(... and Tom's Aunt and Uncle came with Babcia and his dad with some good dinner... it was a nice and needed break!
Today Tommy started the Kerdi in the master bathroom. Since we have the walk in shower we need this waterproof membrane to seal it so it doesn't leak... so Tommy makes a really soupy mixture of mud and slaps it on... then he has to spread it out and make sure it is bonding, overlapping each joint...etc.
I got a tutorial on cutting tile on the saw and I was off to work on the wall tile in the toilet room. I was able to get about 50% done today. It is coming out rather nicely.