There were 16 sections total for the driveway pad and some of the crossways for the pavers were removeable so we could get the concrete truck to reach all of the sections.




Donald Duck? Putting on the duck shoe covers...

Guiding the truck so he straddles the form and can reach all the sections.


First load is poured and finished!


Waiting for the second truck...




Second load is poured and finished!