But when we did get up we picked up some stone dust and then started putting gravel down for the paver walkway from the driveway to the front porch. We have a majority of the stoned down and about 1/3 leveled, compacted, and layered with the first load of stone dust. Then we went down and picked up a load of pavers before they closed.





No comments:
Post a Comment