Saturday, November 6, 2010

FRONT RAILING POSTS

Today Tom and his dad worked on the stair railing on the front porch. They drilled holes in the stairs with the hilti drill. Then they took stainless steel tubing and put it into the holes with the quick drying concrete.


Tommy got a little bit more work done on the front porch this morning and here is finally a picture of the front porch with the corbels.

I worked on the fireplace. I finished the rest of the rock that we didn't finish last night. Then Tom's mom took the rest of the rock outside and put it in the boxes to clean up the family room floor. Meanwhile I laid some of the tile in the master bathroom shower.

No comments:

Post a Comment