Friday, December 31, 2010

NEW YEAR'S EVE

Today we started on the Dining Room!!! We decided to put it on a 45 too! who knew we would start putting everything on a 45... We finished more than 50% before we left for the New Year's Eve festivities at Beata's...

There are a few pictures of Tommy pulling out the staples... The brazillian cherry is so hard that some pieces of wood the staple refuses to go in... instead it gets all bent up and Tommy has to pull it out... not fun!









Thursday, December 30, 2010

CHERRY MANTEL

We were home from work today... We worked on the hardwood floor in the master bedroom in the morning... then we went out to Home Depot around 1:30 and my cold got the best of me. When we got back I was quarantined and Tommy worked on the cherry mantel. He took it outside and ruffed up the ends, rounded the edges and cleaned off the bark stuff from the front. The top and bottom are smooth like glass. All it needs a little more sanding to finish it up but it is looking great!






Tuesday, December 28, 2010

MASTER BATH GROUT...

I was home alone today so I worked some more on the grout in the master bathroom... I finished all the grouting in the shower except for the floor and I finished all the other grout outside of the shower including the floor... Almost finished with this crazy bathroom!



We were supposed to get connected to the sewer today... but because of the Blizzard the contractor canceled. :( Maybe next week! This has been the longest process! We just want to connect to the sewer, how hard can that be!

Monday, December 27, 2010

SNOW DAY!!!

Because of the Blizzard we had the day off from work... We worked on the master bedroom hardwood floor. We started it yesterday and continued today. We were going on both sides of where we started from... I cut and laid out the pieces while Tommy banged them in nailed them. Hooper enjoyed the snow through the window... We finished between 2/3 and 3/4 finished!










Sunday, December 26, 2010

MASTER BEDROOM on a 45

Today we cleaned up the master bedroom and then we started laying the hardwood floor. We did the sitting room first. We did that up until we got to the baseboards... that get's a little slower and is better as a one person job...

Then we started on the master bedroom itself. We decided to put it on a 45 degree angle... The main reason is because the beams switch directions halfway through the room and so if we went either of the other two ways we wouldn't be putting the hardwood floor across the beams. I think the result is good... I love that it is on a 45 and it actually makes it easier... if it were parallel with the radiator it gets difficult to finish but on a 45 it is really easy.



Thursday, December 23, 2010

CHRISTMAS @ BONETOWN

I got a small live tree... I couldn't help it... :) Isn't it cute!

Tuesday, December 14, 2010

J&J Front Hardood Floor

Tonight after work we continued working on the hardwood floor in the front Jack and Jill Bedroom. We have gotten to the long runs that go into the closet but haven't quite finished yet. We had originally planned on putting a sill between the bedroom and the closet but we don't think it would look as good so we decided to nix it and just go straight into the closet...

Monday, December 13, 2010

Car Fix

The car wasn't capable of making it to work today... so Tom worked on the new radiator, brakes, spindles, CV Joint, etc with his dad...

I worked on knocking items off the to do list. I painted the molding in the master bath... grouted the countertop for the master bathroom... painted two doors... vacuumed the rear j&j to get it ready for hardwood and painted the green walls in the kitchen...

Sunday, December 12, 2010

MISC ITEMS

Late morning today... tom went to work on the brakes for the car... fun

I was at the house and today... Doesn't seem like I did much though... I installed some hi hat covers, a few door knobs, some hooks on doors... can't really remember what else though...

Saturday, December 11, 2010

PARTY DAY

Today Tom planned to do my brakes in the morning but when he started decided there was more wrong than just the brakes and would require some additional parts... Meanwhile I made stuffed mushrooms for the later party...

But when that didn't work out we went to work on the hardwood floor in the J&J Front Bedroom...
We got a decent amount done before it was time to get dressed and head to Beata's housewarming and then down to allentown for the LaRue Christmas Party.

Thursday, December 9, 2010

TILE IS DONE :)

Tonight we finished the tile in the master bathroom. Tommy finished up the tiles on the wall around the area for the handheld shower and some other pieces on the floor. I put the tiles on the countertop and now we are OFFICIALLY done with the tile!!! yay!

Sunday, December 5, 2010

CROSSING THINGS OFF

On Saturday we worked on a bunch of smaller tasks... Tommy worked in the laundry room... he caulked the counter and sink, re-installed the dryer, installed a shelf... then he worked in the princess bedroom... he installed hangers in the closet, finished the hardwood floor, installed the toilet in the princess bathroom, put on the baseboard covers, and installed the baseboard molding... and he installed the tops to the windows in the master bathroom. I worked mostly on painting... I painted the base molding and shoe molding, put a coat on the master bath door, painted the floating crown in the master and some of the trim around the house....





Today we decided to conquer some more tile in the master bathroom shower. Tommy cut on the tile saw in the basement and fed me the pieces... I marked them up and installed them... We have all the tiles that needed funky cuts done! Only a few more pieces to go and we will be done with the tile!