Sunday, February 13, 2011

STAIR LANDING

Tommy worked on the first stair landing today...  It is the curved one so it wasn't fun.  First he had to shim up shim up the staircase and then he laid the flooring... He could only go so far and then he used a template to route the curved edge... And then glue down the nosing...  It looks great.



Then he worked on the curve on the bridge... He made a template for the curve and set it up in the right position... then he had the fun job of routing the Brazilian cherry. 





I vacuumed up the entire upstairs... Then I cleaned the up the Jack & Jill Bathroom and the two J&J bedrooms.. I wiped down all the moldings and the doors from the dust... cleaned off the window sills... and the radiators, and then wiped down the walls... cleaned off the glass for the light fixtures and wiped down the bathroom vanity... Just need to clean the windows, both inside and out.  And I hung up the sconces in the master bedroom.
 

No comments:

Post a Comment