Friday, November 26, 2010

Caulk and Laundry

Tommy worked in the laundry room today... He pulled out the washer and dryer and installed the last piece of tile that we didn't install because we were missing a piece of waterproofing when we did it last time. Then he finished up the wainscot and fixed the pocket door to the laundry... He also installed the shelf over the cabinet. He glued up the corners of the floating crown so they are stiff.

Today I caulked... I caulked and puttied the closet in the rear J&J bedroom, the windows in the sitting room, the floating crown in the master, and the crown in the master bathroom.

No comments:

Post a Comment