Sunday, November 21, 2010

COMPLETED FRONT PORCH

I continued to work on the tile in the master shower today... didn't get as much done as yesterday but Tommy helped me out and got some of the more difficult parts done. I installed the tumbled stone on the curving top ledge and he cut some intricate pieces for the swoosh at the top.

Tom's dad finished up the front porch... He made a ring to cover the hole where the light fixture went, sealed it, and then later in the day he installed it.

Tommy worked some more on trimwork. He built the tops for the two windows in the master bathroom and installed crown molding in the skylight area of the master bathroom and finished the rest of the crown in the bathroom.